Quote:
Originally Posted by tarawa
Farmtown day is 20 hours,each .1 is therefore 2 hours.1.2 days=24hours,1.6=32hours.
|
I don't think that is correct. The days shown in those times is actually based on a 24 day. A 2 day crop which is 40 hours shows as 1.6 days. If you divide 40 hours by 24 hours then you get 1.666666, rounded to 1.6 days. So 1.6 x 24 = 38.4 which is not exactly accurate either as it should be 40 hours. And 1.2 x 24 = 28.8 hours.
Not as easy and far from being a good accurate system to determine when crops are going to be ready.