Quote:
Originally Posted by driverdave
and the only way to achieve that is to load those facilitys that he only wants to make certain thigs in ...manually ...maybe the first one or 2 might be load / order all and the subsequent ones he will need to do manually and only load / start / order those things that he wants
|
Dunno if my way of working will suit this problem ?
My way is to load everything until a set stock level is reached, which in my case is 500,000. I then untick the item that has reached the figure until the level drops to 100,000, then I tick it again.